無錫食品車間地坪價(jià)格是多少<聯(lián)系電話400-0709-910>
地坪施工方案是怎么樣的?1、同一地坪施工面,應(yīng)連續(xù)澆筑,人員和機(jī)械數(shù)量到位。2、如夜間砼澆筑,應(yīng)派人值班,保證質(zhì)量和安全。3、機(jī)械操作(園盤抹光機(jī)等)應(yīng)有專業(yè)技術(shù)人員。4、有排水坡度的房間按圖紙要求施工。5、各房間的門口接縫應(yīng)放在室外。6、廠房內(nèi)設(shè)有固定電箱并有專業(yè)電工監(jiān)管。
地坪施工方案土方施工 1、土方回填前首要抽干基坑內(nèi)的積水以及將基坑內(nèi)的夾板、木材、樹枝等雜物整理潔凈,而且用竹簽或短鋼筋頭在水準(zhǔn)儀的找平下做好每皮回填厚度。 2、土方回填應(yīng)依據(jù)施工標(biāo)準(zhǔn)需求,逐層回填夯實(shí),并選用壓路機(jī)縱橫碾壓健壯,到達(dá)施工需求,有專人負(fù)責(zé)。 3、在壓路機(jī)碾壓不到的當(dāng)?shù)剡x用蛙夯分層夯實(shí),以保證回填土的密實(shí)度。 4、壓實(shí)完后應(yīng)做環(huán)刀和擊實(shí)實(shí)驗(yàn)(分層系數(shù)為≥0.94),符合需求后方可進(jìn)行下道工序。地坪施工方案工藝需求:
1、砼墊層 墊層標(biāo)高也選用鋼筋樁操控嚴(yán)格操控其外表平整度在±Cm范圍內(nèi)并選用磨光機(jī)打磨外表不壓光以利于面層的聯(lián)系。
2、防水處置 防水層施工前應(yīng)安排操作人員仔細(xì)了解施工場面體會(huì)規(guī)劃目的把握節(jié)點(diǎn)處置辦法和技能需求了解水泥基浸透結(jié)晶型防水涂料的技能特色、功能和施工需求一起確定本防水工程分工序的查看檢驗(yàn)項(xiàng)目。如施工基面找平層整理、節(jié)點(diǎn)及裂縫的整理的密封處置、防水層施工、節(jié)點(diǎn)及裂縫處增強(qiáng)處置等。 防水層施工前查看砼底層質(zhì)量檢驗(yàn)合格后方可施工施工時(shí)依據(jù)工程量定出資料用量計(jì)劃按計(jì)劃所需用量資料悉數(shù)運(yùn)到現(xiàn)場。 地坪施工工藝是怎么樣的?一般地說,樓地上由面層和底層組成,底層又包含墊層和結(jié)構(gòu)層兩部分。地坪施工工藝流程:打掃收拾底層地上→水泥砂漿找平→定標(biāo)高、彈線→選料→板材浸水濕潤→安裝標(biāo)準(zhǔn)塊→攤鋪水泥砂漿→鋪貼石材→灌縫→清洗→維護(hù)交工。地上常按面層原料和做法分類。加全體地上、板塊地上、石材地上、木地上等。常用的地上裝修原料有:木質(zhì)地板、塑料地板、活動(dòng)地板、化纖地毯、塑料地毯等。
地坪施工工藝原料合作比:(1)水泥砂漿:面層水泥砂漿的合作比應(yīng)不低于1:2,其稠度不大于3.5cm。水泥砂漿有必要拌合均勻,色彩一致。(2)水泥石屑漿:假如面層選用水泥石屑漿,其合作比為1:2,水灰比為O.3~0.4,并特別要求做好維護(hù)工作。
地坪施工工藝關(guān)鍵:(1)鋪抹面層前,先將底層澆水濕潤,第2天先刷一道水灰比為0.4~0.5的水泥漿聯(lián)系層,隨即進(jìn)行面層鋪抹。假如水泥素漿聯(lián)系層過早涂Floor construction program is kind of how? 1, the same floor construction plane, should be continuous pouring, place the number of personnel and machinery. 2, such as night pouring, should be sent on duty to ensure quality and safety. 3, mechanical operations (disc trowel, etc.) should be professional and technical personnel. 4, there is drainage slope of rooms by drawing construction. 5, the door seams should be placed outside each room. 6, the plant equipped with fixed electric box and a professional electrician supervision.
Floor 1 earthwork construction program, the primary water drain before backfilling excavation within the pit and the plywood inside, wood, twigs and other debris finishing clean, and short steel head with a bamboo stick or do at Level leveling Each skin backfill thickness. 2, backfilling construction standards should be based on demand, backfill compaction layer by layer, and the choice of vertical and horizontal roller compacted robust construction demand arrives, a person responsible. 3, less than the local selection of roller compacted frog hierarchical compaction ram to ensure the density of backfill. 4, compaction should be done after cutting ring and compaction experiments (stratification factor ≥0.94), before the next step after the meet the demand. Floor construction plan process requirements:
1, concrete cushion cushion elevation also use steel pile handling strict control on its outer flatness within ± Cm range and choice of grinder polished look no calendering the surface layer in order to facilitate contact.
2, waterproof layer waterproof disposal operator should arrange careful pre-construction planning experience to understand the purpose of the construction scene node grasp disposal methods and skills needed to understand cement-based penetration crystalline waterproofing coating of skill features, functions and construction demand together determine this sub-step waterproofing Check test items. Such as the construction of the base surface finishing leveling layer, sealing cracks disposal nodes and finishing, construction, waterproof layer node and cracks enhanced disposal. Waterproof layer of concrete before construction view the underlying quality inspection after construction based on the project before construction fix the amount of data usage plan according to plan all the information needed for the amount transported to the site. Floor construction process is how? Generally speaking, on the ground floor composed by a surface layer and the bottom, the bottom cushion and consists of two parts and structural layers. Floor construction process: clean tidy cement mortar bottom floor → → set level, the choice of materials elastic line → → → installation standard sheet soaking wet cement paving blocks → → → pouring paving stone → cleaning → Maintenance Labor Exchange. Often by the ground surface layer material and classification practices. Plus all the earth, plate floor, stone floor, wood floor and so on. Common ground decoration materials: wood floors, plastic flooring, floor, synthetic carpets, plastic carpets.
Floor construction process feed Cooperation ratio: (1) the cement mortar: cooperation than the surface layer of cement mortar shall not be less than 1: 2, the consistency of not more than 3.5cm. It is necessary to mix cement mortar uniform, consistent color. (2) cement slurry stone chips: If the choice of the surface layer of cement slurry stone chips, its co-ratio of 1: 2, water-cement ratio O.3 ~ 0.4, and special requirements to do maintenance work.
Floor construction critical process: (1) shop front wipe the surface layer, the first water wet bottom, two days before the first brush a water-cement ratio of 0.4 to 0.5 grout contact layer, then be paved surface wipe. If the cement paste link layer premature coating
資訊來源:<聯(lián)系電話:400-0709-910>
|